Unfoldwhat your data actually says.

You know what your asset cost. Do you also know what falls due over the next five years, what is overdue, and where each of those figures comes from?

First the lists

An asset is a handful of lists.

The three that every asset needs. Today they sit in spreadsheets, in email attachments and with the property manager, and nowhere side by side.

CapEx list

Every planned investment with its trade, its yearly slice and the finding it came from.

Expert reports and maintenance list

Surveyor reports per installation, with inspection intervals and deadlines, maintenance contracts and records — without asking the property manager.

Rent roll

Who, how many square metres under which measurement standard, and how much rent per square metre. Overviews for optimisation, accurate to the day.

And the lists you will need tomorrow.

For us a list is a structure, not a module with its own invoice. New ones are added without anything changing in the model. And the best part: the reports and lists update themselves as the documents do.

ESG and EU taxonomycoming shortly

Criteria per asset, aggregated across the fund. Coming shortly.

Building condition report

The condition of each component over the years, with the same evidence as everything else.

Your own list

For us a list is a structure, not a module with its own invoice. New lists are added without the model changing.

Then the dashboard

The same lists, unfolded.

No dry column of figures and no long spreadsheet. Costs per year, open tickets, progress against the EU taxonomy. For the portfolio and for each individual asset.

DOREE+ UnfoldBeispielportfolio Deutschland ISample data

Portfolio

8 assets, 134,900 m², as at 07/12/2026. All values are aggregated from the asset lists.

CapEx 2026 to 2030

19.82€ m

planned, from the lists

Maintenance backlog

3.72€ m

immediate and short term

Open findings

134

14 high · 50 medium · 70 low

Open tickets

60

9 overdue

EU taxonomy

69%

criteria met on average

Evidence ratio

88%

entries with a linked document

Costs per yearCapEx by category, in € millions
024m2026, Roof and facade: 1,200 € k2026, Building services: 900 € k2026, Fire safety: 600 € k2026, Interior fit-out: 400 € k2026, ESG and energy: 700 € k3.820262027, Roof and facade: 1,400 € k2027, Building services: 1,100 € k2027, Fire safety: 300 € k2027, Interior fit-out: 600 € k2027, ESG and energy: 900 € k4.320272028, Roof and facade: 900 € k2028, Building services: 1,300 € k2028, Fire safety: 200 € k2028, Interior fit-out: 800 € k2028, ESG and energy: 1,100 € k4.320282029, Roof and facade: 700 € k2029, Building services: 1,000 € k2029, Fire safety: 150 € k2029, Interior fit-out: 900 € k2029, ESG and energy: 1,200 € k4.020292030, Roof and facade: 500 € k2030, Building services: 800 € k2030, Fire safety: 100 € k2030, Interior fit-out: 600 € k2030, ESG and energy: 1,470 € k3.52030
  • Roof and facade
  • Building services
  • Fire safety
  • Interior fit-out
  • ESG and energy
Findings per assetby risk
BER-03BER-03: 4 Findings, Risiko highBER-03: 11 Findings, Risiko mediumBER-03: 12 Findings, Risiko low27FRA-01FRA-01: 3 Findings, Risiko highFRA-01: 9 Findings, Risiko mediumFRA-01: 14 Findings, Risiko low26MUC-02MUC-02: 1 Findings, Risiko highMUC-02: 6 Findings, Risiko mediumMUC-02: 9 Findings, Risiko low16STU-06STU-06: 2 Findings, Risiko highSTU-06: 5 Findings, Risiko mediumSTU-06: 9 Findings, Risiko low16DUS-05DUS-05: 2 Findings, Risiko highDUS-05: 7 Findings, Risiko mediumDUS-05: 6 Findings, Risiko low15HAM-04HAM-04: 1 Findings, Risiko highHAM-04: 4 Findings, Risiko mediumHAM-04: 8 Findings, Risiko low13NUE-08NUE-08: 1 Findings, Risiko highNUE-08: 5 Findings, Risiko mediumNUE-08: 5 Findings, Risiko low11CGN-07CGN-07: 3 Findings, Risiko mediumCGN-07: 7 Findings, Risiko low10
  • High risk
  • Medium risk
  • Low risk
EU taxonomy progressCriteria met across the portfolio, per quarter
050100Q3 2025: 41 %Q3 2025Q4 2025: 48 %Q4 2025Q1 2026: 57 %Q1 2026Q2 2026: 64 %Q2 2026Q3 2026: 69 %Q3 202669 %
Evidenced entriesShare with a linked document
88Prozent

88 of 100 entries lead back to a document, a page and a passage. The rest are recorded but not yet evidenced. That is the figure an outsourcing controller wants to see first.

Assets

Open an asset to go into its lists

In this demo FRA-01 is worked out down to the passage in the survey.

Behind these figures

The example portfolio, the eight assets and the surveyors' names are invented. What is real is the structure: this is how the lists, the links and the levels are organised in DOREE+ Unfold. The EU taxonomy check is coming shortly.

Why the figures hold

Every figure has an address.Document, page, passage.

Every entry is linked to its document, with the page and the passage. Audit-proof.

That is the difference between a figure somebody once typed in and a figure you can defend in front of the regulator, the buyer or the board.

And there is more, if you want it.

Everything here is in the same asset, in the same model, and without its own invoice. Nobody has to use it.

Ticketing

A finding becomes a task with a status, a priority and an owner.

Photo documentation

Condition as panorama, video and single shot, tagged and dated.

Linked documents

Every line in every list can point to a document, a page and a passage.

Findings table in DOREE+ with number, trade, finding and the derived task — here conveyor systems, roofs and external wall openings.
Findings: the trade, the finding and the task that follows from it.
Analysis of active tickets in DOREE+ by status and priority.
Tickets: the status and priority of active tasks.

Billing is per asset.

From 199 € a month per asset, from twelve months, volume discount from twenty assets. A portfolio is a conversation, not a shopping basket.

Bring one of your assets.We will unfold it once.

One hour, your own records, our lists. After that you will know whether it holds up for your portfolio.